From: route@monster.com
Sent: Friday, May 06, 2016 11:19 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: Right Of Way
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Douglas V Brodeur, PEPage 1 Douglas V Brodeur, PE 10 Sandy Pond
Parkway, Bedford, NH 03110 | (603) 660-6733 | dbrodeur1@gmail.com EDUCATION Virginia Tech, Blacksburg (1997-1998) Cadet, Virginia Tech Corps of Cadets General Engineering University of New Hampshire,
Durham (1998-2001) BS Civil Engineering Continuing education Oil and Gas Pipelines Installation Impact and Mitigation OSHA Excavation Safety (29 CFR 1926.650 Subpart P) Various courses in: Water resources, surveying, project management,
and A/E/C general seminars OSHA Hazardous Waste and Operations (HAZWOPER-40 hour) Electrical Power Supply & Distribution Overall Market Seminar Independent study and paper on the design and history of highway
transportation engineering American
Society of Civil Engineers (ASCE) Hydraulic Engineering College River
Analysis System (HEC-RAS) certification
course
Professional registrations New Hampshire Professional Engineer No 12986 New Hampshire Subsurface Designer No 1619 New Hampshire
Surveyor in Training No 615
Expert Witness Testimony Bob Rheault v. State of New Hampshire Consisted of
land owner arguing wrongful damage to property access due to the realignment
and expansion of an existing highway, the case settled prior to any legal
hearings. AsSociations and civic Goffstown, NH Planning Board; Alternate (3-years) International Right-of-Way Association (IRWA) New England Commerce Association (NECA) Habitat for Humanity, volunteer work American Red Cross, donor Free Mason, Washington Lodge#61 American Society of Civil Engineers (ASCE) National
Society of Professional Engineers (NSPE) LANGUAGES English-native language French-basic verbal/grammar skills Thai-basic
verbal skills general work professional profile ·
13+ years working in civil
engineering, construction, and energy including commercial and residential
site planning and design, large scale utility design and permitting,
right-of-way and land acquisition, and flood control. ·
Proven ability to prepare small to
large scale projects from start to finish including project drawings,
specifications, stormwater management reports, preparation of permits,
coordination with other disciplines (i.e. Traffic, Environmental, Highway,
Geo-Tech, mechanical, electrical etc.); ·
Design experience includes, but
not limited to: roadway, utility, grading, stormwater management, highway,
right-of-way and land acquisition, and flood control; ·
Intimate understanding of
regulatory requirements for land development projects; ·
Understanding of CFR 49, Part 192
‘TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY
STANDARDS’; ·
Represented firms and clientele at
Planning Boards, Zoning Boards of Adjustments, Conservation Commissions,
Regulatory and Permitting Agencies, etc; ·
Trained employees in the use of
software (AutoCAD, HydroCAD, etc.), Stormwater Management Report (Hydrologic
and Hydraulic Calculations, proper technical writing, etc.), plan
preparation, company procedures, general engineering practice and
professional standards, etc.; ·
Inspected construction sites for
compliance with project drawings and specifications ·
Plan review and quality
assurance/quality control (QA/QC). familiar software ·
AutoCAD-CIVIL 3D; ·
HydroCAD; ·
StormCAD; ·
SewerCAD; ·
HEC-RAS; ·
Microstation, minor experience; ·
MS OFFICE and general
windows/apple software. work history CHA Companies/Coler & Colantonio, Inc. PO BOX 5269; III Winners Circle; Albany, NY 12205-0269 Phone:
(518) 453-4500 Supervisor: Thomas N True, PE/Joe Andriano Employment Period: September 2012—June 2014 Title: Civil Engineer IV Division: Power and Energy Market; Utilities, right-of-way services,
and energy groups (sections) ·
Right-of-way and land acquisition
services for several utility projects, specifically for Northeast Utilities
(NU) and Public Service Companies of New Hampshire (PSNH) for the ISO-NE
reliability program; ·
Site design and permitting for
several utility substation/meter and regulating sites, mainline valve sites,
and construction laydown and pipe storage yards; ·
Design and permitting of several
state highway, federal interstate, and private railroad crossings for high
pressure gas transmission line installations and temporary and permanent
access crossings; ·
Provided cost and material
estimates for utility installations; ·
Analyzed Class Studies and High
Consequence Area (HCA) studies for gas transmission line installations, in
accordance with CFR 49, Part 192; ·
Prepared alignment sheets, details
and acted as QA/QC manager for large scale gas transmission project; ·
Mentored junior staff and trained
in the use of software packages, and well as standard engineering practice. Brolaw Construction, LLC 10 Sandy Pond Parkway; Bedford, NH 03110 Phone: (603) 660-6733 Supervisor: Self Employment Period: 2010-2011 Title: Owner/Member Started
ran and managed all aspects of a general contracting and home building firm.
Company was shuttered due to partnership disagreements. 347 Lancaster Hill, LLC 10 Sandy Pond Parkway; Bedford, NH 03110 Phone: (603) 660-6733 Supervisor: Self Employment Period: 2010-2011 Title: Owner/Member Worked for several firms and private corporations in a contract
employment scenario, providing a variety of engineering services including,
but not limited to: ·
Hydraulic and hydrologic analysis; ·
Construction cost and quantity
estimates; ·
Construction schedule estimates,
for pre construction bidding timelines; ·
Civil site and land development
engineering services; ·
Plan review and QA/QC. Vanasse Hangen Brustlin, Inc 2 Bedford Farms Drive, Suite 200; Bedford, NH 03110 Phone: (603) 391-3900 Supervisor: R Gordon Leedy, LA, Director of Land Development Employment Period: 2006-2008 Title: Project Engineer True Engineering, Inc (defunct company) Supervisor: Thomas N True, PE, President/Owner Prepared design plans, specifications, and permitting documents for
multiple small to large scale residential development, commercial development
and survey projects. Assisted the firm owner with several internal policies
and operation of firm, as well as, assisting with getting the firm up and
running after total loss fire. Implemented policies of a
digital ‘paperless’ [TNT2]office system, that prevented the complete financial loss of the
company, after the fire. Also developed engineering and plan standards,
standard operating procedures, and assisted the firm owner with general
management and staff policies. select projects[TNT3] ·
FM Global
Corporate Headquarters (FM Global; Warwick, RI) 366,660 sf LEED gold rated corporate office campus. · Merrimack Premium Outlets (Chelsea Development; Merrimack,
NH) Mixed use 550,000 sf retail space mall, 100+ outlet retails, 200 room
hotel, and restaurant development project. · St. Paul’s School Flood Remediation Study (St. Paul’s
School; Concord, NH) Flood prevention and remediation study and engineering, due to $5
million of property damage caused by the ‘Mother’s Day’ storm (May,2006). ·
Greenfield
Farms Subdivision (Lamontagne Builders; Bedford, NH)[TNT4] 364 luxury lot single-family residential development; which
included complete design & permitting. Permits acquired include but are
not limited to FEMA, Army Corps, multiple jurisdictions and an E-1 Sewer
system. · Northern Pass (Northeast Utilities; NH) 1,200 MW electric transmission power line, including AC converting,
extending power capabilities from Hydro Quebec to the greater electric grid
in Deerfield. · Goffstown Kindergarten, Glen Lake School (SAU # 19;
Goffstown, NH) General site design and permitting for the last community in the US
without a public kindergarten. The project was specifically challenging due
to an opposing abutter, whom was senior administrator in the NH Department of
Environmental Services. · Addison Natural Gas Project; (Vermont Gas Systems,
Chittenden & Addison Counties, VT) 43 mile 12” natural gas pipeline design and permitting, including 10
miles of additional distribution main, meter and regulating stations,
mainline valve site design, and multiple access roads.[TNT5] [TNT1]This is some
of your best work experience, you should say a lot more about it, say the
size of the company, etc. In a CV, the
more the merrier. [TNT2]I know what
you mean but you should expand & say this was done before. You were a big
part of what we were doing so I think you can say we were a “startup” you
helped establish drawing standards, general procedures, standard documents,
branding, etc. The fire
itself & the fact that we were up & running the next day is probably
deserving of it’s own paragraph. [TNT3]Add hyperlinks
whenever you can. [TNT4]I can
obviously get you .pdfs of this & other TRUE projects if that
helps. I’ve sent “sample work” & it has helped A TON. [TNT5]Again, you
can/should embellish more on these. List hurdles & how they were
overcome. |
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|